Tuesday, 31 January 2017
31/01/2017
today we could not do our final production as we had problems because we could not update the apps still and the IT guy will not be in till next week delaying our time to perform our final production, in the end we did do a run and it did go better than in the past and help us decide what we want for the final production.
Monday, 30 January 2017
30/01/17
Today was supposed to be social challenges day to preform there production but unfortunately our teacher was not in because of some issues. Instead we are London my team we set up to do a particle run through before our assessment tomorrow. The run though did not go as planed and some my team was just standing around and not doing there role or turned up late.
Tuesday, 24 January 2017
production meeting 24/01/2017
At the beginning social challenge ended up setting up for their production and i ended up being a guest as usual for there game show, as for the games all are stuff was pre recorded so we did not have to do it again.
Half way through the lesson we swapped over and i took my role of director and we had a guest come in to be on our show, the first thing i did was tell the floor manager to move the table to the correct position, then made sure that everyone was getting ready to take their positions, the only problem we had was that the sound person was very late with the sounds,Other than that some other things need to be fixed up but other than we should be ready for next week. Also we will set up the instrumentals for the guest to rap or sing over. I got some feedback that i did an alight job as a director.
Monday, 23 January 2017
feedback 23/01/27
Today we had a change of plans, instead of the other group doing the production we took over as we have not a a run through because of people not turning up, instead we took over and started to prepare to record, two of our cameraman's did not turn up so we got someone to fill in for us. As director i still had to set up the table and help set up the cameras as who ever was supposed to set up did not do it, our result in the end came out alright even though it dragged a bit and they were not able to know when the adverts or music was playing, but other we need to improve to setting up the equipment.
Wednesday, 18 January 2017
17/01/17
Our 9am lesson was cancelled due to our teacher being sick and still a lot of students did not turn up,but we still went to the tv studio and the other team started to set up as they had more students to prepare to film their production. The second lesson at 10:20am we were still in the studio as it was our class time to record and the studio was nearly set up, it was just the sound that was left to do. i was doing my role as being one of the guess for the other group.
Wednesday, 11 January 2017
Monday, 9 January 2017
09/01/17
Today we did not practice our tv show as not enough turned up to do any work and the laptop key was also lost so we could not use the laptops to do any work on blogger or drive so we was let go early to go to another class or to the library. I went to A26 to check up on my blog to make sure everything is up that should be.
Wednesday, 4 January 2017
camera practice
Today we had the technicians come in and set up the ipad stand and the ipad software and they explained how to use the app and then we had a chance to use the app our self to get a feel how to use it. we also discussed the finally day that we will do are finally production (01/31/17).
Subscribe to: